Valve Insertions
Deposit, New York (click link to see pictures) - Installed 2-8" E-Z valves
- Installed 2-6" E-Z valves - All
valves installed without shutting a single line off!
Pipe Bursting
- 5200' Burst of existing 8" VCP sewer
- 600' Burst of existing 10" PVC sewer
- 525' Lateral burst of existing 4" Cast Iron sewer
- 300' Static Upsize Burst of existing 8" Ductile to 10" HDPE
Town of Vestal, Vestal, New York - 3000' Burst of existing 8" VCP sewer
- Used to correct major root intrusion
- Upsized 400' of existing 4" CI watermain to 8" HDPE
New Windsor, New York -
2200' Static Burst
- Upsize existing sewer main from 12" VCP to 16" HDPE
- Included one single pull of 1100' through a swamp
Manlius, New York - Easement ran behind homes
in residential area
- Upsize existing sewer main from 8" VCP to 10" HDPE
- Summer '09
Village
of Lansing, Lansing, New York - 800' Burst of existing 8" AC sewer
- Sewer ran underneath other utilities
- 3 lateral connections
Manhole Rehabilitation
- 55 manholes
- Leak Correction by Pressure Grouting
- Relining
- Manhole Insert installation
|